Artlant (Sines) – Electrical heat trace (installation, tests and connections).

Artlant (Sines) – Commission of electricity (Crossing and testing cables, connections of frames, motors and lightings).

Artlant (Sines) – Primary and secondary cable trays (20.000m).

Hidrocontratcto (foz do lizandro) – Treatment plant wastewater on Foz do Lizandro (electricity, instrumentation and commissioning).

Petrogal (Tanquisado) – substitution of equipments in order to comply with ATEX standards (phase 2)

LBC TANQUIPOR - Power and control of electrical actuators.

J.Gonzaga Rosa (Sines) – Installation of alternative energy (air conditioning, solar heating and SHW).

Petrogal (Tanquisado) – Replacement of motorized valves.

Petrogal (Sacavem) – Pumping system automation.

Petrogal (Refinaria de Sines) – Fiber optic cables reparation and certification.             

Prio energy – Fuel system transfer  

CLT (TGLS) – supplying and installation level in Tank 06TK01

Petrogal (Tanquisado) – Fully automation of fuel Cogeneration Island.

Petrogal (parque da boa nova ) – Access Control Automation.

Prio energy - Automation control system of additive pumps.

LBC Tanquipor – Development of CEPSA’s Interface.

Petrogal (Porto) – Implementation of the access control system of vehicles for the plants of lubricants, with integration in mainstream.

Petrogal (Refinaria de Sines) – supply and installation of access control system for tank cars.

Petrogal (Refinaria de Sines) – Upgrade of access control and automatic filling tank cars system.

Petrogal (Tanquisado) – supply and installation of access control and automatic filling tank cars system.

Petrogal (Tanquisado) – Replacement and equipment in order to comply with ATEX standards.

Petrogal (Refinaria de Sines) – supply and installation of PLC CONTROL ordinance trucks.

Endress and Hauser – supply and configuration of fuel filling system for SKID’s.

CLT (TGLS) – Supply, installation and configuration of the new fiber optic network in oil terminal of Sines.

Endress and Hauser – Radio Communication system for transmit instrumentation signals.

REN ATLANTICO (Sines) - ISPS 3 reception.

LBC Tanquipor – Supply and installation of automatic filling of tank cars (4 Loading Bays).

LBC Tanquipor – Communication data network.

CLT (Terminal Petroleiro de Sines) – Structured network.

PORTUCEL DE VIANA – Instrumentation work in annual shutdown.

PETROGAL (Porto Brandão) – Removal of control system filling tank cars (COTAS UNIX) Faro Park and installation in the park of Porto Brandão.

MARTIFER/PRIO ENERGY (Aveiro) - Supply an installation of automatic system for detection of vehicle license plate.

MARTIFER/PRIO ENERGY (Aveiro) – Supply and installation of access control system.

MARTIFER/PRIO ENERGY (Aveiro) – Supply and installation of instrumentation overall fuel storage facilities.

MARTIFER/PRIO ENERGY (Aveiro) – Supply and installation of filling tank cars system (5 loading Bays).

MARTIFER/PRIO ENERGY (Aveiro) – Supply and installation of levels control system (levels, pressures, temperatures).

MARTIFER/PRIO ENERGY (Aveiro) – Supply and installation of Control system for biofuel Facility.

EDP/EFACEC – Commissioning of the FGD (Desulfurization) in groups one and two of Sines Thermal Power Plant.

EDP/EFACEC – commissioning of new DCS in groups one and two of Sines Thermal Power Plant.

EDP/EFACEC – Remodeling of the regulatory system of local chains of group one and two of Sines Thermal Power Plant.

SOLVAY – Installation of instruments and commissioning, in the new ED (station of dematerialized water).

SAAGA (Acores) – Supply and configuration of ENRAF equipments.

APS (Sines) - Supply and configuration of ENRAF equipments.

PETROGAL (Sines) – Access Control of vehicles and tank cars.

APS (Sines) - Technical assistant of ENRAF levels.

EDP/CPPE - Supply, installation and commissioning of the switchgear and control the power supply of the new electrical heat trace on Fuel pipeline.

EDP/CPPE - Supply, installation and commissioning of a new electrical heat trace (18x1.150m) on Fuel pipeline.

PETROGAL (Sines) – installation of additive system on two loading Bays of tank cars.

Contacts

Telefonista2

Tel +351 269 759 100
Fax +351 269 759 109

Localisation

MAPASINES

Learn how to find us.
See the map.
Click Here

Portfolio

Meet the main works

HPIM0520

Click Here

Information

If you need information please contact.
 
info
 
Click Here